www.4hu_人人揉_超碰东京热_欧美激情一区二区A片_国产真实夫妇4p交换

黃巖模具,注塑模具,塑料模具,模具廠家,日用品模具,塑料箱模具,塑料椅子模具,涂料桶模具,垃圾桶模具
黃巖模具,注塑模具,塑料模具,塑料箱模具,模具廠家 Taizhou Huangyan Xiaolin Mold Co., Ltd.
 
日用品模具,黃巖模具 模具廠家 ,塑料模具,塑料箱模具,塑料椅子模具 Chinese
注塑模具  模具廠家   日用品模具 黃巖模具 English
 
黃巖日常用品模具,臺(tái)州汽車件模具,臺(tái)州黃巖吹塑模具,臺(tái)州黃巖注塑模具,臺(tái)州家電模具
 
黃巖日常用品模具,臺(tái)州汽車件模具,臺(tái)州黃巖吹塑模具,臺(tái)州黃巖注塑模具,臺(tái)州家電模具
黃巖日常用品模具,臺(tái)州汽車件模具,臺(tái)州黃巖吹塑模具,臺(tái)州黃巖注塑模具,臺(tái)州家電模具
 
黃巖日常用品模具,臺(tái)州汽車件模具,臺(tái)州黃巖吹塑模具,臺(tái)州黃巖注塑模具,臺(tái)州家電模具
 
黃巖日常用品模具,臺(tái)州汽車件模具,臺(tái)州黃巖吹塑模具,臺(tái)州黃巖注塑模具,臺(tái)州家電模具
黃巖日常用品模具,臺(tái)州汽車件模具,臺(tái)州黃巖吹塑模具,臺(tái)州黃巖注塑模具,臺(tái)州家電模具 Design Process
Home > Process technology > Design Process
黃巖日常用品模具,臺(tái)州汽車件模具,臺(tái)州黃巖吹塑模具,臺(tái)州黃巖注塑模具,臺(tái)州家電模具

 

Firstly, our technical dept.will do preliminary analysis on feasibility of the product mould and scrutiny on the product drawing mainly for the critical dimension and structure. Such analysis will do a big favour to the following mould design.

 

According to the drawing offered by customer, the technical dept.need confirm following points:

1): Material of the product

2): product shrinkage

3): Dimensions Accuracy

4): Product appearance requirements

5): the number of products in the mold inside

6): so what is the role of the product. These key points identified the technology sector began to customer product design mold 3D data.

 

黃巖日常用品模具,臺(tái)州汽車件模具,臺(tái)州黃巖吹塑模具,臺(tái)州黃巖注塑模具,臺(tái)州家電模具

To convert the product to be programmable 3D data in a computer, there are several ways. A) Make the product's 3D data based on its simple drawing. B) Measuring the sample via Tri-ordinate Measuring and the data will be transferred into the computer for data organization. C) Scanning the sample to get 3D data directly

After getting these data, the technician need 3D softwares like UG to process the data. From point to line, from line to face, and from face to solid modelling.

With the product 3D data,technicians still need use 3D softwares like UG to make the preliminary design for its mould. Mould design must strictly follows company's design rules. Only after the team leader from production dept.confirm the mould design from technical dept., the data can be sent to machining centers for following process.Above is the whole mould design process.

 

 

 
Add:Ao'an Industrial Zone, Huangyan, Taizhou, Zhejiang  Tel:+86-576-84270858

Copyright©2015-2017 Taizhou Huangyan Xiaolin Mold Co., Ltd.   Technical support [Tzjuyou]

Online service